[an error occurred while processing this directive]
[an error occurred while processing this directive]

Wisconsin airport operations

An active airport

General information | Wisconsin airport security information | Tall tower construction or alteration | Building an airport/landing strip | Sample agreements and ordinances

General information

Wisconsin airport security information

Tall tower construction or alteration

  • Conditions for building tall towers (Trans 56)  
  • The first step you must take, as the tall tower sponsor, is to determine if you are required to file an airspace study with the FAA (previously done with a paper form 7460). The FAA now requires that all airspace studies be filed electronically on the FAA's OE/AAA website. First you must use the Notice Criteria Tool on the lower left side of the webpage to determine if you need to file a notice of proposed construction with the FAA. If the Notice Criteria Tool requests that you file, follow the instructions on how to E-file on the OE/AAA home-page, it will guide you through the filing process.

  • Tall tower permit application
  • Questions on permits for tall towers e-mail Justin Hetland, justin.hetland@dot.wi.gov or phone (608) 267-5018

Building an airport/landing strip

Sample agreements, ordinances and minimum standards

Top Return to top


Related aeronautic links:

Questions about the content of this page:
Scott Brummond, scott.brummond@dot.wi.gov

Last modified: June 4, 2013

[an error occurred while processing this directive]